Aariha Group

BIM PROCESS

Outcome

Aligned objectives and established BIM execution strategy.

Collection

Gathering architectural plans, structural briefs, and client preferences.

Rule

Understand twice, model once.

01

Project Information Collection

The process begins with understanding project requirements, design information, specifications, and stakeholder objectives.

02

Digital Model Development

An intelligent digital model is created to represent building components, spaces, materials, and relationships.

Outcome

Data-rich architectural and structural BIM foundation.

Detail

Setting up levels, grids, and elements with precise coordinates.

Rule

Model for constructability, not just visual accuracy.

Outcome

Fully coordinated multidisciplinary model.

Meetings

Regular clash detection and cross-team resolution sessions.

Rule

Clash-free in digital means hassle-free on site.

03

Collaboration & Coordination

BIM allows architects, engineers, consultants, and contractors to collaborate efficiently within a shared environment.

04

Information Management

All project information is maintained within a centralized system, ensuring that stakeholders always have access to accurate and updated information.

Outcome

Centralized data environment with full document revision history.

System

Intelligent parameter tags, asset schedules, and revision controls.

Rule

Data integrity breeds building success.

Outcome

Immersive walk-throughs and clear spatial verification.

Aesthetics

Light studies, material mockups, and client walkthroughs.

Rule

See the space before laying a single brick.

05

Design Visualization

Three-dimensional visualization improves understanding of building spaces, design intent, and project requirements.

06

Construction Planning

Digital information supports planning and execution activities, helping project founders improve efficiency and reduce uncertainties.

Outcome

Streamlined sequencing, crane placement, and logistical planning.

Phasing

4D scheduling integration and temporary works staging.

Rule

Plan the build, build the plan.

Outcome

Coordinated GFC drawing sets and accurate material quantities.

Accuracy

Auto-updating elevations, sections, and schedules.

Rule

Never draw twice. One model, one truth.

07

Documentation Management

Project documentation is generated directly from coordinated models, ensuring consistency and reducing errors.

08

Lifecycle Support

BIM information continues to provide value after construction by supporting maintenance, facility management, and future renovations.

Outcome

Digital twin ready for operational maintenance and management.

Value

COBie sheet handovers, structural warranties, and renovation templates.

Rule

A building's digital heart beats forever.